Links

Click on a link below for more information:

Water hardness map

Scale Control Mechanism powerpoint presentation.

    Note: The powerpoint file can take several minutes to download and open. If you have
    difficulty opening the file, click the link and save it to your desktop or hard drive (My
    Documents) then go to where you saved the file and double-click it.  If you do not have
    Microsoft Office Powerpoint, you will have to download and install a Powerpoint viewer.  
    Click here to download it.

BOILERS: With the high cost of electricity, natural gas or fuel oil, the WaterGuard may reduce
your utility bills by an average of 25% - 35% to achieve the same end results. The WaterGuard
removes 99.9 % of all buildup of existing scale and keeps it from forming again. A 1/8 inch of
scale buildup requires an additional 25% in the utility bill each and every month. Chemical
costs are virtually removed, an additional savings.   

Cooling Tower with Filtration

Cooling Tower and Boiler Brochure

Federal Technology Alert on boilers

COOLING TOWERS: The WaterGuard in conjunction with our filtering system may reduce the
building heating and cooling electrical cost by an average of 15%-25%. Chemical costs are
virtually removed, an additional savings.